The PASC Lodge Addition - The Second Floor



The second floor has started
The last of the
old kitchen
The roof comes
off
Locker
Room
beams
Peter J. was at Tahoe last week and stopped by the construction site. He sent me a bunch of pictures - I'll add four of them. The locker room is framed in and huge. We are debating giving up on lockers and buying a ping pong table.
The locker/air hockey room
(September 3rd.)
The new kitchen
View from upstairs living area
Outside the new
wood locker
The roof ridge beam is in
place. Gordon put it up
and that's Troy bolting it
in place. (September 5th.)
The first roof rafters
go up
Living room wall in place. That's
either Mark or Troy (September 9th)
Outside the new
wood locker (September 11th)
A rare picture of our
contractor, Gordon Shaw,
who's normally behind
the camera. (He's about
to drop a piece of 4by
on is foot)
It looks as if we are getting close
to framing inspection. Better get the
check book out, Evelyn
September 12th
The next page - the outside is tight - we begin to focus inside
Previous page
Home

This page last updated on September 21st, 2003.