The second floor has started |
|
The last of the old kitchen |
|
|
The roof comes off |
|
Locker Room beams |
|
The locker/air hockey room (September 3rd.) |
|
|
The new kitchen |
| View from upstairs living area |
|
|
Outside the new wood locker |
|
The roof ridge beam is in place. Gordon put it up and that's Troy bolting it in place. (September 5th.) |
|
|
The first roof rafters go up |
|
Living room wall in place. That's either Mark or Troy (September 9th) ![]() |
|
|
Outside the new wood locker (September 11th) |
|
A rare picture of our contractor, Gordon Shaw, who's normally behind the camera. (He's about to drop a piece of 4by on is foot) |
|
|
It looks as if we are getting close to framing inspection. Better get the check book out, Evelyn |
| September 12th |
|